Shanghai
Tel:021-32231668 55521666
Fax:021-32231667 55522299
E-mail:group@aegis-env.com
Daqing:
Tel:0459-5152900
Fax:0459-5152921
E-mail:group@aegis-env.com
Oilfield environmental protectionYou are here:HOME > Engineering Records > Oilfield environmental protection > 

Mud Curing Process of Jidong Oilfield


Problem

Large amounts of pollutants can be produced on the oil and gas exploration and development process, and waste drilling mud is one of the main pollutants. If not handled properly, the pollutants will inevitably contaminate the local environment and cause immeasurable damage, while in turn, pollution of the environment will restrict the development of the petroleum industry. So the mud curing process is imminent.

Pollutant

Waste drilling mud filtrate

Solution

Our Company adopts self-developed curing agents for curing mud filtrate, after treatment all indicators can meet national standards.

Achievement

Chroma < 80 times
pH:7~9
COD:1215.6 mg/l
Compressive strength > 0.8 Mpa



Previous:Xinjiang Tarim Oilfield
Next:Well Yingshen No.4 of Daqing Oilfield
 

Add: Aegis Building,No.8 Lane 4855,Guangfulin Road,Shanghai,China P.C.:201616 Tel: 021-55521666
Add: No2.Xinxian Road,Ranghulu District,Daqing,Heilongjiang,China P.C.:163453 Tel: 0459-5152900